Piping Construction Q&A

Piping Construction Discussion Forum

A

In what position should the ball valves be maintained during hydrostatic test?

Valve manufacturers recommendation shall be followed while performing hydrostatic testing of ball valves along with…
1 answer 0 votes 2088 views
Posted 3 years agoby admin
A

Why is flushing prior to Hydrotest and drying after Hydrotest important?

Microbiologically Induced Corrosion (MIC) is a potential damage mechanism that can occur during the hydrostatic…
1 answer -6 votes 2259 views
Posted 3 years agoby admin
A

What is the definition of Heat Affected Zone of a Weld?

Heat Affected Zone (HAZ) refers to that portion of the base metal that is not…
1 answer 0 votes 379 views
Posted 3 years agoby admin